Pura Vida Engineering Services (PVE) writes dewatering plans and files dewatering permit applications with Florida’s water management districts for construction projects that need groundwater control.
Dewatering plans for construction excavations
Groundwater modeling
Preparation and filing of dewatering permit applications
Coordination with the water management district through the permit process
We file dewatering permits with all five of Florida’s water management districts:
Dewatering plans depend on subsurface conditions. PVE uses its own drilling fleet (truck-mounted, track-mounted, and mudbug rigs, plus barge capability) for borings and field permeability testing. Samples are tested in our CMEC-accredited, FDOT-qualified laboratory, and our geotechnical engineers review the results.
Send us your site plan, excavation depths, and construction schedule, and we will tell you what the permit requires and prepare a proposal.
Pura Vida Engineering Services, 4071 L B McLeod Rd Suite E, Orlando, FL 32811.
Send us your site plan, excavation depths, and construction schedule, and we will tell you what the permit requires and prepare a proposal.
4071 L B McLeod Rd Suite E Orlando, FL 32811
Mon–Fri 8 AM–5 PM