Representative PVE photo, not taken on this project.

At a glance

Project facts

Project
SR 40 ITS Safety Deployment, SR 35 to Volusia County Line
Owner
Florida Department of Transportation, District 5
Location
SR 40, Marion and Lake counties, FL
Financial Project ID
451415-3-52-01
PVE service
Materials testing: quality control
PVE’s role
QC subcontractor to SICE, Inc., the prime contractor
Structures
Four dynamic message sign (DMS) structures on drilled shafts
When PVE worked
2025 (notice to proceed June 2025)
The project

Safety and traveler information on SR 40

According to FDOT, the project installs safety equipment along a 34-mile segment of State Road 40 from SR 35 to the Volusia County line, including solar-powered wildlife warning signs, traffic cameras on new concrete poles, smoke and fog sensors, and four digital traffic signs. FDOT lists it as a safety project in Lake and Marion counties.

PVE’s work was on the foundations of the four digital message sign structures.

Source: FDOT District 5, CFLRoads project 451415-3

Four DMS foundationsClass IV drilled-shaft concrete tested in PVE’s laboratory.
PVE’s role

Quality control for four sign-structure foundations

For SICE, PVE served as the project’s quality control manager for the drilled-shaft work and tested the drilled-shaft concrete in our FDOT-qualified laboratory.

QC management

Prepared and administered the quality control plan, tested to FDOT standards, and reported conformance and non-conformance.

Laboratory concrete testing

Compressive strength testing (ASTM C39) of Class IV drilled-shaft concrete for structures DMS-1 through DMS-4. The DMS-1 cylinders averaged 7,180 psi at 28 days against a 4,000 psi requirement.

Reporting

Concrete results were reported through FDOT’s Materials Acceptance and Certification system.

How we work

How PVE delivers construction materials testing

These are company-wide capabilities. Our field and laboratory teams are FDOT and CMEC accredited, and our technicians are CTQP-qualified.

FDOT prequalified in Work Groups 9.3 (Highway Materials Testing) and 10.3 (Construction Materials Inspection)

CTQP-qualified technicians

Concrete compressive strength testing (ASTM C39) in our own laboratory

Laboratory testing using ASTM, AASHTO and FDOT methods

Contact

Have a similar project?

Send us your plans, specifications, and schedule, and we will prepare a testing and inspection proposal.

Address

4071 L B McLeod Rd Suite E Orlando, FL 32811

Hours

Mon–Fri 8 AM–5 PM

Request a testing proposal