Project
Widen Turnpike Mainline (SR 91), Minneola to US 27
Owner
Florida’s Turnpike Enterprise (FDOT)
Location
Florida’s Turnpike (SR 91), Lake County, FL
Financial Project IDs
435786-1 (Minneola to US 27 South Ramp) · 435786-3 (O’Brien Rd to US 27)
PVE service
Geotechnical drilling: deep SPT bridge borings
PVE’s role
Drilling subconsultant to Stantec, the design consultant; GEC was geotechnical engineer of record
North segment (PVE)
5 SPT borings, 175.5 to 238 ft deep; reported 2023, updated 2024
South segment (as AWK)
2020, by our team when it operated as AWK Consulting Engineers
The project

Widening Florida’s Turnpike through Lake County

Florida’s Turnpike Enterprise describes the project as widening the Turnpike Mainline (SR 91) from the Minneola interchange to the US 27 interchange in Lake County, increasing the number of travel lanes from four to eight. Planned construction includes pavement widening, new stormwater treatment facilities, new bridge structures, new tolling sites, lighting and interchange improvements.

The Enterprise is delivering the corridor in segments, including Minneola to north of O’Brien Road and O’Brien Road to the US 27 North interchange.

Sources: Florida’s Turnpike project fact sheet (FPID 435786-1) · Turnpike Widening from Minneola to O’Brien Road · Widen Turnpike, O’Brien Road to US 27

Deep bridge boringsFive SPT borings to as deep as 238 ft for two new Turnpike bridges.
PVE’s role

Deep SPT borings for new Turnpike bridges

The borings supported design of the bridge foundations on both segments of the widening. Working for Stantec, PVE’s task was the drilling and the drafting of the bridge boring information. GEC, the project’s geotechnical engineer of record, staked the boring locations and performed the laboratory testing.

North segment: O’Brien Road to US 27

PVE performed five SPT borings, 175.5 to 238 ft deep, for two bridges: O’Brien Road over SR 91 and SR 91 over US 27. The data collection report is dated May 10, 2023, and was updated June 7, 2024.

South segment: Minneola to US 27 South Ramp

In 2020 our team, then operating as AWK Consulting Engineers, drilled the deep SPT borings for four south-segment bridges: Scrub Jay Lane over SR 91, SR 91 over CR 561, SR 91 over SR 19 (Howey Road), and the US 27 South Ramp over SR 91.

Deliverables

Boring information drafted for the data collection report for bridge development, submitted to Stantec.

How we work

How PVE delivers geotechnical drilling

These are company-wide capabilities. PVE runs its own drilling fleet and an FDOT-qualified, CMEC-accredited laboratory.

Three in-house drill rigs: truck-mounted, track-mounted and mudbug

Barge capability for borings over lakes, rivers and coastal waters

FDOT prequalified in Work Groups 9.1, 9.2 and 9.4.1

CMEC-accredited laboratory using ASTM, AASHTO and FDOT methods

Contact

Have a similar project?

Send us a site plan with proposed structures and any boring layout, and we will scope the exploration program.

Address

4071 L B McLeod Rd Suite E Orlando, FL 32811

Hours

Mon–Fri 8 AM–5 PM

Request a drilling proposal