Photo: PVE crew coring pavement on Power Line Road (Phase 2, Segments 3 & 4), January 2025.

At a glance

Project facts

Project
Power Line Road, Phase 3 and Phase 2 (Segments 1–7)
Location
Haines City, Polk County, FL
PVE service
Geotechnical drilling, roadway soil surveys, pavement coring
PVE’s role
Geotechnical subconsultant to KCG Transportation Services, the design consultant
Phases covered
Phase 3 · Phase 2, Segments 1 & 2, 3 & 4, and 5, 6 & 7 · sheet wall
When PVE worked
Reports from December 2023 to March 2026
The project

Building out Power Line Road in phases

Power Line Road is being designed in phases through Haines City. Phase 3 is a new four-lane urban roadway from White Clay Pit Road to Bannon Island Road. The Phase 2 segments improve the existing two-lane road from East Hinson Avenue north to South Boulevard East, with new stormwater ponds and swales.

Power Line Road corridor with survey flags along the shoulder

Photo: Power Line Road corridor, Phase 2 Segments 3 & 4, January 2025.

PVE’s role

Roadway, pond and wall exploration, phase by phase

For each phase, working for KCG Transportation Services, PVE drilled borings along the alignment and at planned ponds, measured groundwater at the time of drilling and after 24 hours, tested samples in our laboratory, and prepared a roadway soil survey report with design recommendations.

Field exploration

Machine auger, manual auger and SPT borings along the roadway and in planned ponds and swales, plus five SPT borings to 35 ft along a planned sheet wall.

Pavement evaluation

Pavement cores taken from the existing road on Phase 2, Segments 3 & 4, and photographed and measured in the laboratory.

Laboratory testing

Soil classification, grain size, natural moisture content, organic content, corrosion series, constant-head permeability and Limerock Bearing Ratio tests.

Reports

A roadway soil survey report for each phase, plus a sheet-wall design-parameters report.

PhaseLimitsWhat PVE didReport
Phase 3White Clay Pit Rd to Bannon Island Rd (about 4,000 ft)3 machine auger borings to 20 ft; 10 manual auger borings to 5 ftDec 2023
Phase 2, Seg. 3 & 4Baker Dairy Rd to Snell Creek Rd (about 7,900 ft)7 machine auger borings to 20 ft; 22 manual auger borings to 5 ft; 7 pond borings to 15 ft; pavement coresDec 2024
Phase 2, Seg. 5, 6 & 7Snell Creek Rd to South Blvd ESPT and hand auger borings along the road; SPT borings at planned ponds and swales2025
Phase 2, Seg. 1 & 2E. Hinson Ave to Baker Dairy RdSPT and hand auger borings along the road; pond borings2025
Sheet wall (Seg. 1 & 2)Planned sheet wall alignment5 SPT borings to 35 ftMar 2026
Photos

From the field

How we work

How PVE delivers geotechnical drilling

These are company-wide capabilities. PVE runs its own drilling fleet and an FDOT-qualified, CMEC-accredited laboratory.

Three in-house drill rigs: truck-mounted, track-mounted and mudbug

Barge capability for borings over lakes, rivers and coastal waters

FDOT prequalified in Work Groups 9.1, 9.2 and 9.4.1

CMEC-accredited laboratory using ASTM, AASHTO and FDOT methods

Contact

Have a similar project?

Send us a site plan with proposed structures and any boring layout, and we will scope the exploration program.