Across several phases from 2023 to 2026, PVE explored soil and groundwater conditions for the roadway, stormwater ponds and a sheet wall on Power Line Road in Haines City, and cored the existing pavement.
Photo: PVE crew coring pavement on Power Line Road (Phase 2, Segments 3 & 4), January 2025.
Power Line Road is being designed in phases through Haines City. Phase 3 is a new four-lane urban roadway from White Clay Pit Road to Bannon Island Road. The Phase 2 segments improve the existing two-lane road from East Hinson Avenue north to South Boulevard East, with new stormwater ponds and swales.

Photo: Power Line Road corridor, Phase 2 Segments 3 & 4, January 2025.
For each phase, working for KCG Transportation Services, PVE drilled borings along the alignment and at planned ponds, measured groundwater at the time of drilling and after 24 hours, tested samples in our laboratory, and prepared a roadway soil survey report with design recommendations.
Machine auger, manual auger and SPT borings along the roadway and in planned ponds and swales, plus five SPT borings to 35 ft along a planned sheet wall.
Pavement cores taken from the existing road on Phase 2, Segments 3 & 4, and photographed and measured in the laboratory.
Soil classification, grain size, natural moisture content, organic content, corrosion series, constant-head permeability and Limerock Bearing Ratio tests.
A roadway soil survey report for each phase, plus a sheet-wall design-parameters report.
| Phase | Limits | What PVE did | Report |
|---|---|---|---|
| Phase 3 | White Clay Pit Rd to Bannon Island Rd (about 4,000 ft) | 3 machine auger borings to 20 ft; 10 manual auger borings to 5 ft | Dec 2023 |
| Phase 2, Seg. 3 & 4 | Baker Dairy Rd to Snell Creek Rd (about 7,900 ft) | 7 machine auger borings to 20 ft; 22 manual auger borings to 5 ft; 7 pond borings to 15 ft; pavement cores | Dec 2024 |
| Phase 2, Seg. 5, 6 & 7 | Snell Creek Rd to South Blvd E | SPT and hand auger borings along the road; SPT borings at planned ponds and swales | 2025 |
| Phase 2, Seg. 1 & 2 | E. Hinson Ave to Baker Dairy Rd | SPT and hand auger borings along the road; pond borings | 2025 |
| Sheet wall (Seg. 1 & 2) | Planned sheet wall alignment | 5 SPT borings to 35 ft | Mar 2026 |



These are company-wide capabilities. PVE runs its own drilling fleet and an FDOT-qualified, CMEC-accredited laboratory.
Three in-house drill rigs: truck-mounted, track-mounted and mudbug
Barge capability for borings over lakes, rivers and coastal waters
FDOT prequalified in Work Groups 9.1, 9.2 and 9.4.1
CMEC-accredited laboratory using ASTM, AASHTO and FDOT methods
Roadway soil survey, pavement evaluation and contamination screening for Consor on a Volusia County project.
View project →Roadway soil survey for BCC Engineering on Florida’s Turnpike Enterprise’s widening of SR 417 to eight lanes.
View project →Soil and foundation inspection, laboratory testing of concrete, pavement, structural steel testing, thermographic imagery.
View service →Sub-surface exploration, soil sampling, diamond coring, augering, environmental drilling, grouting.
View service →Dewatering plans and applications filed with all five of Florida’s water management districts.
View service →Send us a site plan with proposed structures and any boring layout, and we will scope the exploration program.
4071 L B McLeod Rd Suite E Orlando, FL 32811
Mon–Fri 8 AM–5 PM