Home›Projects›Williamson Boulevard Widening
For Volusia County’s widening of Williamson Boulevard, PVE prepared the roadway soil survey, a pavement evaluation and a Contamination Screening Evaluation Report (CSER).
Photo: pavement core location C-4 marked on Williamson Boulevard.
The project widens Williamson Boulevard for about 1.7 miles from Madeline Avenue to Beville Road. The existing road is a two-lane undivided section with paved shoulders, running through a mix of residential and commercial properties.

Photo: pavement core C-7 from Williamson Boulevard, measured in the PVE laboratory.
Working for Consor Engineers, PVE handled three parts of the design-phase investigation: the roadway soil survey, an evaluation of the existing pavement, and an environmental contamination screening of the corridor.
Soil classification, grain size, natural moisture content, organic content, corrosion series, Limerock Bearing Ratio and constant-head permeability tests.
Pavement cores taken along the corridor and evaluated in a pavement evaluation report (March 2024).
Review of historical aerials, city directories, fire insurance maps and state and federal environmental databases. Risk ratings under the FDOT PD&E Manual were assigned to seven sites: three low and four medium.



These are company-wide capabilities. PVE runs its own drilling fleet and an FDOT-qualified, CMEC-accredited laboratory.
Three in-house drill rigs: truck-mounted, track-mounted and mudbug
Barge capability for borings over lakes, rivers and coastal waters
FDOT prequalified in Work Groups 9.1, 9.2 and 9.4.1
CMEC-accredited laboratory using ASTM, AASHTO and FDOT methods
Roadway, pond and sheet-wall exploration and pavement coring for KCG Transportation Services, 2023–2026.
View project →Roadway soil survey for BCC Engineering on Florida’s Turnpike Enterprise’s widening of SR 417 to eight lanes.
View project →Soil and foundation inspection, laboratory testing of concrete, pavement, structural steel testing, thermographic imagery.
View service →Sub-surface exploration, soil sampling, diamond coring, augering, environmental drilling, grouting.
View service →Dewatering plans and applications filed with all five of Florida’s water management districts.
View service →Send us a site plan with proposed structures and any boring layout, and we will scope the exploration program.
4071 L B McLeod Rd Suite E Orlando, FL 32811
Mon–Fri 8 AM–5 PM