Photo: pavement core location C-4 marked on Williamson Boulevard.

At a glance

Project facts

Project
Williamson Boulevard Widening, Madeline Avenue to Beville Road
Owner
Volusia County
Location
Daytona Beach area, Volusia County, FL
PVE services
Geotechnical drilling, pavement evaluation, contamination screening
PVE’s role
Geotechnical and environmental subconsultant to Consor Engineers, the design consultant
When PVE worked
CSER and pavement evaluation March 2024; final soil survey December 2025
The project

Widening a 1.7-mile corridor

The project widens Williamson Boulevard for about 1.7 miles from Madeline Avenue to Beville Road. The existing road is a two-lane undivided section with paved shoulders, running through a mix of residential and commercial properties.

Pavement core C-7 showing asphalt over base, beside a scale

Photo: pavement core C-7 from Williamson Boulevard, measured in the PVE laboratory.

PVE’s role

Soils, pavement and contamination screening in one team

Working for Consor Engineers, PVE handled three parts of the design-phase investigation: the roadway soil survey, an evaluation of the existing pavement, and an environmental contamination screening of the corridor.

Roadway, swale and pond borings

  • Roadway: 10 machine auger borings to 20 ft and 44 manual auger borings 1.5 to 5 ft deep
  • Swales: 17 machine auger borings to 10 ft, with 4 permeability tests
  • Ponds 1, 2, 3A and 3B: 11 manual auger borings 3.5 to 5 ft deep

Laboratory testing

Soil classification, grain size, natural moisture content, organic content, corrosion series, Limerock Bearing Ratio and constant-head permeability tests.

Pavement evaluation

Pavement cores taken along the corridor and evaluated in a pavement evaluation report (March 2024).

Contamination Screening Evaluation Report

Review of historical aerials, city directories, fire insurance maps and state and federal environmental databases. Risk ratings under the FDOT PD&E Manual were assigned to seven sites: three low and four medium.

Photos

From the field

How we work

How PVE delivers geotechnical drilling

These are company-wide capabilities. PVE runs its own drilling fleet and an FDOT-qualified, CMEC-accredited laboratory.

Three in-house drill rigs: truck-mounted, track-mounted and mudbug

Barge capability for borings over lakes, rivers and coastal waters

FDOT prequalified in Work Groups 9.1, 9.2 and 9.4.1

CMEC-accredited laboratory using ASTM, AASHTO and FDOT methods

Contact

Have a similar project?

Send us a site plan with proposed structures and any boring layout, and we will scope the exploration program.

Address

4071 L B McLeod Rd Suite E Orlando, FL 32811

Hours

Mon–Fri 8 AM–5 PM

Request a proposal